Media Team | 10th January 2024 | Bwana Mkubwa Constituency | Ndola
Twashuka ward is currently undergoing a thorough inspection of its drainage system construction. The dedicated team is meticulously examining every aspect of the project, ensuring that the drainages are built to the highest standards.
From the materials used to the design and implementation, no detail is being overlooked.
This comprehensive inspection aims to guarantee that the drainages in Twashuka ward are not only functional but also durable, capable of withstanding any weather conditions.
The team’s commitment to excellence ensures that the construction of these drainages will greatly benefit the community for years to come.